ADVERT T2023-26 Gunjana Water Supply Scheme Phase 3A – Construction of Pump station, Drilling of 2 Boreholes, Bulk Water 5.8 km Bulk Pipeline, 50KL Reservoir and Installation of Break Pressure Tanks in Msinga LM

[featured_image]
Download
Download is available until
  • Version
  • Download 648
  • File Size 285.10 KB
  • File Count 1
  • Create Date March 20, 2023
  • Last Updated March 20, 2023

ADVERT T2023-26 Gunjana Water Supply Scheme Phase 3A – Construction of Pump station, Drilling of 2 Boreholes, Bulk Water 5.8 km Bulk Pipeline, 50KL Reservoir and Installation of Break Pressure Tanks in Msinga LM

Leave a Reply

Your email address will not be published. Required fields are marked*